Kitchen Cabinet Installation Cost in 2026: Labor Per Cabinet, Per Foot, and Per Kitchen

Kitchen cabinet installation cost in 2026 is mostly a labor number: national cost guides put professional labor at about $50 to $200 per linear foot of cabinets, or $40 to $100 an hour, which works out to roughly $1,000 to $4,000 for the 20 feet of cabinetry in a standard 10x10 kitchen. Removal of the old cabinets, trim work, assembly of flat-pack boxes and any plumbing or electrical work are priced on top, and they are where two quotes for the same kitchen drift thousands of dollars apart.
We sell cabinets for a living and we don't install them. We ship nationwide, and the cabinets you buy from us go in with your own installer or your own hands. So this guide is written from the other side of the counter: what the published cost data says, why the sources disagree, what a fair scope looks like, and how an itemized cabinet list lets you compare installer quotes line for line instead of guessing.
Key Takeaways
- Labor benchmarks: $50–$200 per linear foot or $40–$100 per hour (Fixr, January 2026); $125–$500 per cabinet (Taskrabbit, September 2026). Labor is typically 30–50% of an installed-cabinet total.
- Standard 10x10: about 20 linear feet and 11–14 boxes, so $1,000–$4,000 of installation labor before removal, trim extras and trade work.
- Biggest add-ons: tear-out and haul-away ($300–$1,000), RTA assembly, crown and fillers, scribing to crooked walls, uppers run to the ceiling, islands, and licensed plumbing or electrical work.
- Time on site: Fixr gives 1–3 days for a mid-size kitchen; Taskrabbit gives 2–4 days for a standard one.
- Quotes only compare when the scope matches: give every installer the same itemized cabinet list and trim list, and ask them to price the same lines.
Table of Contents
- How Installers Price the Job: Per Box, Per Foot, Per Hour
- Why Published Cost Figures Disagree
- Labor vs Materials in an Installed Kitchen
- Installation Labor by Kitchen Size
- What Pushes an Install Quote Up
- What an Island Adds to the Install
- RTA Assembly: The Line That Erases Savings
- Worked Example: Pricing the Install on a Real 10x10
- Regional Labor Rates
- Handyman vs Carpenter vs General Contractor
- How to Get and Compare Installer Quotes
- Where Installation Sits in the Remodel Schedule
- DIY Installation: What You Save and What You Risk
- Frequently Asked Questions
How Installers Price the Job: Per Box, Per Foot, Per Hour
Cabinet installers quote in one of four units, and the unit matters as much as the rate. Ask which one a quote uses before you compare it with anything else.
| Pricing unit | Published 2026 range | Source | Works best for |
|---|---|---|---|
| Per linear foot | $50–$200 per foot of cabinet run, labor only | Fixr, updated Jan 22, 2026 | Full kitchens with a clear run length |
| Per hour | $40–$100 an hour for installers; $38 national average for Taskrabbit's minor-repair taskers | Fixr (Jan 2026); Taskrabbit (Sep 1, 2026) | Small jobs, repairs, one or two added cabinets |
| Per cabinet (per box) | $125–$500 per cabinet | Taskrabbit, Sep 2026 | Kitchens where box count is known from an itemized list |
| Flat project price | $3,000–$5,000 for a "standard kitchen" | Taskrabbit, Sep 2026 | Homeowners who want one number and a fixed scope |
Box count tracks the real work better than feet do, which is why many cabinet installers price that way. A 36-inch sink base and a 9-inch spice base take nearly the same time to level, shim and fasten, even though one covers four times the wall. So a kitchen built from narrow boxes costs more per foot to install than one built from wide ones, and a per-foot quote hides that.
Hourly pricing favors you in a clean, square room and punishes you in an old house where every wall needs scribing. Flat pricing moves that risk to the installer, which is why a flat bid on a room nobody has seen is often padded. The mistake is comparing a per-foot bid with a per-box bid without converting both to the same kitchen.
Why Published Cost Figures Disagree
Search for cabinet installation prices and you will see per-cabinet figures from $125 to over $770. They are not all wrong; they measure different things.
- Labor only vs installed. Fixr's cabinet installation cost guide separates labor ($50–$200 per linear foot) from its installed-kitchen totals, which include the cabinets. Homewyse's kitchen cabinet installation calculator quotes $511–$774 per cabinet for September 2026, but that figure bundles a cabinet and job supplies with the labor.
- Job minimums. Homewyse builds a two-hour labor minimum into its estimates. On one cabinet that minimum is most of the bill; on a full kitchen it disappears into the total. A per-cabinet price quoted for a single box is not the per-cabinet price for twelve.
- What counts as a "10x10". Fixr's size table puts a 10x10 kitchen at 16 linear feet of cabinetry. The cabinet industry's 10x10 convention, which our 10x10 kitchen cabinet pricing guide uses, is two 10-foot walls, 20 linear feet. The same per-foot rate gives a 25% different total depending on which you use.
Treat any single published number as a range marker, not a quote. Below, we use labor-only figures wherever a source gives them.
Labor vs Materials in an Installed Kitchen
Fixr puts labor at 30–50% of the total cost of installed kitchen cabinets. The share swings with the cabinets, not the labor: hanging a value-tier box takes about as long as hanging a semi-custom one, so the cheaper the cabinets, the bigger the labor slice.
Here is that split using the per-foot cabinet prices our cabinet cost estimator uses for the lines we sell, with Fixr's labor range added on top. The cabinet figures are ours; the labor figures are Fixr's.
| Cabinet tier (brands) | Cabinets per linear foot | Labor per linear foot | Installed per linear foot |
|---|---|---|---|
| Value RTA (KCD, US Cabinet Depot, Tribeca) | $150–$250 | $50–$200 | $200–$450 |
| Most popular (Fabuwood, J&K, Modernform, Mantra) | $250–$400 | $50–$200 | $300–$600 |
| Semi-custom (Diamond, Decorá) | $400–$650 | $50–$200 | $450–$850 |
Those are cabinet-and-labor figures only. Countertops, the sink, appliances, freight and decorative hardware sit outside them. For the full budget across every tier, our guide to how much kitchen cabinets cost covers the box side; this page stays on the labor.
A reality check on the hourly rate. The Bureau of Labor Statistics puts the median carpenter wage at $29.12 an hour (May 2025). A billed rate two or three times that is not gouging. It pays for liability insurance, a truck and tools, travel, unpaid estimating time, and the callback when a door needs adjusting three weeks later. An installer billing near the wage rate is often uninsured, which matters the day something breaks.
Installation Labor by Kitchen Size
Run length and box count set the base labor number. The table applies Fixr's $50–$200 per-foot range and, as a cross-check, Taskrabbit's $125–$500 per box. The box counts are our own rough figures for each layout, not a source's; your itemized list replaces them.
| Kitchen | Typical linear feet | Typical boxes | Labor at $50–$200/ft | Labor at $125–$500/box |
|---|---|---|---|---|
| Galley or single wall | 10–14 | 7–10 | $500–$2,800 | $875–$5,000 |
| 10x10 L-shape | 20 | 11–14 | $1,000–$4,000 | $1,375–$7,000 |
| 10x12 L-shape | 22 | 12–15 | $1,100–$4,400 | $1,500–$7,500 |
| 12x12 with a small island | 25–30 | 15–20 | $1,250–$6,000 | $1,875–$10,000 |
| Large kitchen with pantry wall and island | 35–45 | 22–30 | $1,750–$9,000 | $2,750–$15,000 |
The per-box column runs higher because the $500 end of Taskrabbit's range reflects small jobs carrying minimum charges. Two other published figures land inside the 10x10 row: Taskrabbit's flat $3,000–$5,000 for a standard kitchen, and This Old House's note that pro installation starts at about $2,500 for a basic 10-by-10. If one bid lands far outside that band, ask what it includes before you decide it is high or low.
The cabinet side of these kitchens is priced by size in our 10x10 pricing guide, and the measurements that decide your own run length are in our list of kitchen dimensions to check before buying cabinets.
What Pushes an Install Quote Up
Two kitchens with the same footage can be a day apart in labor. These are the items that move a quote, roughly in the order we see them surprise people.
| Cost driver | Why it adds labor | How to keep it in check |
|---|---|---|
| Removing and hauling away old cabinets | Tear-out, disconnects, disposal fees; Fixr puts removal at $350–$1,000, Taskrabbit at $300–$500+ | Ask for it as its own line; do the haul-away yourself if you have a truck |
| Flat-pack (RTA) boxes | Every box is built before it is hung | Assemble yourself, or order pre-assembled |
| Crown, light rail and fillers | Finish carpentry: coped or mitered corners, scribed fillers | Get the trim list on the cabinet order so the installer prices known pieces |
| Out-of-plumb walls, out-of-level floors | Scribing fillers and panels, more shimming, sometimes a ledger | Check walls with a level before quoting and tell the installer |
| Uppers to the ceiling | Taller boxes, stacked uppers, ladders, taller crown | Decide the ceiling treatment before ordering, not on install day |
| Island | Anchoring to the floor, panels on the seating side, often an outlet | Price it as a separate line |
| Tall pantry and oven cabinets | Heavy, must be plumb in two directions, cutouts for appliances | Confirm appliance specs are on site before install |
| Panel-ready appliances | Fitting dishwasher or refrigerator panels to the appliance maker's template | Have the appliance delivered before the installer comes |
| Access and delivery | Stairs, long carries, curbside freight left at the driveway | Arrange carry-in; note it on the quote |
Removal and older homes
Tear-out is quick; the time goes into what it exposes, such as unpainted wall behind the old uppers or flooring that stops where the old cabinets sat. Budget a patch-and-paint allowance if the layout changes. In a home built before 1978, EPA's Renovation, Repair and Painting rule requires anyone paid to disturb painted surfaces to be certified, with workers trained in lead-safe practices, which adds containment and cleanup time. Ask any installer working on an older house whether their firm holds that certification.
Plumbing, gas and electrical
Cabinet installers set boxes; they generally don't move pipes or wires. Disconnecting and reconnecting a sink, dishwasher, range or disposal is licensed work in most places, billed separately by a plumber or electrician, and a gas line is never a cabinet installer's job. BLS medians for plumbers ($30.67 an hour) and electricians ($30.38, both May 2025) sit close to carpenters', but licensed trades often charge a service minimum per visit, so two short visits (disconnect before, reconnect after) cost more than one. Moving the sink or adding an island outlet turns it into rough-in work that needs a permit in most jurisdictions.
Crown, fillers, scribing and the countertop gap
Trim is where a fast installer and a careful one part ways. Fillers get ripped and scribed to the wall so the run doesn't show a tapered gap; crown gets mitered or coped at every corner and nailed to the cabinet top or a riser strip. Our guide to end panels, scribe molding and fillers explains which gap gets which piece, and the cabinet molding types guide covers the profiles. For a price anchor, Homewyse's crown molding installation estimate puts room crown at $14.77–$22.61 per linear foot installed, material included (September 2026). Crown on cabinets is slower per foot than crown on a ceiling line, because it sits on a narrow box top and turns more corners. Some installers fold trim into the per-box price and some list it; just know which.
Then there is the countertop. Stone and quartz fabricators template after the bases are set, level and fastened, because the template is a record of those exact boxes. That leaves a gap between the cabinet install and the countertop install, so many installers set bases, let the fabricator in, and come back for trim, panels and hardware. Two trips can mean two trip charges; ask how the quote handles it.
What an Island Adds to the Install
An island is usually two to four base cabinets set back to back or side by side, and the boxes install like any base. What costs more is everything around them. There is no wall to fasten to, so the installer screws cleats or blocking to the floor and fastens the cabinets over them. It is seen from four sides, so finished end panels and often a back panel get fitted and scribed to the floor. And an outlet, a sink or a cooktop brings a plumber or electrician onto the job.
In labor terms, an 8-foot island is 8 more linear feet at $50–$200, or three or four more boxes at a per-box rate, plus anchoring and panels. On a slab or finished floor, getting power to it means cutting a path through the floor, which can cost more than the island's cabinet labor. Plan clearances before wiring; our kitchen island clearance guide gives the aisle widths that decide how big the island can be.
RTA Assembly: The Line That Erases Savings
Ready-to-assemble cabinets ship flat and cost less than the same boxes built at the factory. Someone still has to build them, and if that someone is your installer, it is billed.
The published figures are hard to use as they stand. Homewyse's RTA assembly estimate for September 2026 starts at $207–$530 per cabinet, but that is a one-cabinet job carrying a two-hour labor minimum, so it says little about box twelve. Time is the better yardstick. This Old House budgets 20–30 minutes per cabinet, or about 6 hours for a 10-by-10 kitchen with 12 cabinets. Multiply by Fixr's $40–$100 hourly range and each box is roughly $13–$50 of assembly time, or $160–$600 for those 12 boxes.
A quote well above that range is charging for something else, usually unpacking, sorting, checking parts against the list and hauling away a mountain of cardboard. That is fair work to bill as long as it is named. Then compare the assembly line with what RTA saved you on the cabinets; on a small kitchen the two can come close. Our full-kitchen RTA cost breakdown and the RTA vs pre-assembled comparison run that math by line. J&K ships flat-pack only and Fabuwood ships pre-assembled; for the other lines, ask which formats are available before you commit.
Worked Example: Pricing the Install on a Real 10x10
Here is a real cabinet list priced through installation. The Fabuwood Galaxy Frost 10x10 kitchen (SKU FGF10) is listed at $3,500.00 and ships pre-assembled. The listing calls it a 12-piece layout; itemized, it is eleven cabinets plus a dishwasher end panel. There are seven wall cabinets, including a 30-inch diagonal corner wall and a 12-inch wall cabinet above the range, and four bases: a sink base, a blind corner base, a double-door base with two drawers and a single-door base with a drawer. Two toe kicks and six finished ends round it out. The list has no fillers, crown, light rail or pulls, and countertops, appliances and installation are not part of it.
Say the room needs two base fillers and a simple crown. At Galaxy Frost prices, a GF BF3 base filler is $26.00, and crown is sold in 96-inch sticks from $117.00 (GF CM-1, the smallest profile) to $367.25 (GF CM-8, the tallest). Three sticks, 24 feet, should cover the uppers in this L with some left for miters. Now the labor, two ways:
| Line | Low | High | Basis |
|---|---|---|---|
| Cabinets (FGF10, pre-assembled) | $3,500 | $3,500 | Our listed price |
| Two GF BF3 fillers + three sticks of GF CM-1 crown | $403 | $403 | 2 × $26.00 + 3 × $117.00 |
| Installation labor, per-foot method | $1,000 | $4,000 | 20 ft × $50–$200 (Fixr) |
| Installation labor, per-box method | $1,375 | $5,500 | 11 boxes × $125–$500 (Taskrabbit) |
| Removal and haul-away of old cabinets | $350 | $1,000 | Fixr |
| Plumber to disconnect and reconnect sink and dishwasher | Separate trade quote | Local rate | |
| Freight | Quoted up front with the order | By weight and destination | |
On the per-foot method, cabinets, trim, labor and removal land between about $5,250 and $8,900 before freight, plumbing and countertops. Because the boxes arrive assembled, there is no assembly line.
An hourly bid is harder to pin down, so here is the arithmetic with its assumptions stated. Fixr gives 1–3 days for a mid-size kitchen. If that means one installer working 8-hour days, it is 8–24 billable hours, or $320–$2,400 at $40–$100 an hour; a two-person crew bills twice the hours for the same days. That is why an hourly bid on a clean, square room can undercut a per-foot one. On a room with crooked walls the hours climb and the per-foot price doesn't, so there the fixed price protects you.
The package is a starting list, not a finished design. Swap a door base for a drawer bank and the box count, and a per-box installer's price, changes with it, so get the final list before asking for quotes.
Regional Labor Rates
Where you live moves the labor number more than which cabinets you buy. Taskrabbit's cabinet installation cost guide (September 2026) publishes average hourly rates in its largest markets against a $38 national average for minor home repairs:
| Metro | Average hourly rate | vs $38 national average |
|---|---|---|
| New York City | $65 | +71% |
| Seattle | $65 | +71% |
| San Francisco Bay Area | $62 | +63% |
| Boston | $60 | +58% |
| Washington, DC | $58 | +53% |
| Chicago | $57 | +50% |
| Austin | $54 | +42% |
| Denver | $54 | +42% |
| Los Angeles and Orange County | $50 | +32% |
| Miami | $46 | +21% |
These are marketplace taskers, who skew toward smaller jobs, so read the table as a regional index rather than what a cabinet specialist charges. The pattern still carries over: the same hour of work costs half again as much or more in New York, Seattle or Boston as the national figure. Homewyse's calculators adjust by ZIP code if you want a local benchmark before calling anyone.
Handyman vs Carpenter vs General Contractor
Who you hire decides what the quote covers, and who answers when something goes wrong.
| Who | Typical pricing | Good fit | Watch for |
|---|---|---|---|
| Handyman | Hourly, often with a minimum | A few cabinets, a laundry room, a vanity, hardware | Stone-countertop kitchens need a level plane a generalist may not deliver; check insurance |
| Cabinet installer or finish carpenter | Per box or per foot, trim sometimes separate | A full kitchen where you (or a GC) coordinate the other trades | Plumbing, electrical and drywall are excluded; you schedule them |
| General contractor | Project price, cabinet labor inside it, plus overhead and markup | Layout changes, moved plumbing, new circuits, permits, one point of responsibility | Homewyse suggests adding 13–22% when a GC supervises; get cabinet labor broken out |
Licensing rules vary by state, so check your state's contractor licensing board, and whatever the rules say, ask for a certificate of liability insurance. A cabinet dropped on a new floor, or a wall cabinet screwed into nothing but drywall, is exactly what that policy is for.
If you are a contractor pricing your own installs, the trade side works differently. Our Captivating Pro program gives contractors 20–40% off retail on the lines we carry, and our cabinets for remodelers page covers how jobsite orders are packed and scheduled.
How to Get and Compare Installer Quotes
Most bad installation surprises trace back to quotes that priced different jobs. We build and remodel kitchens ourselves, and the quotes that hold up are the ones written against an itemized list rather than a photo of the room.
- Finish the cabinet list first. An installer who prices from "an L-shaped kitchen, about 20 feet" is guessing. One who prices from eleven boxes, two fillers, three sticks of crown and a dishwasher panel is quoting.
- Send the same packet to three installers. The itemized list, the floor plan and elevations, photos of the walls and floor, the ceiling height, the countertop material and the appliance models.
- Ask for the same lines back. Box installation, assembly (if RTA), fillers and panels, crown and light rail, hardware, removal and haul-away, and anything they exclude.
- Convert to one unit. Divide each labor total by the box count and by the linear feet. A bid that looks cheap per foot and expensive per box is usually leaving something out.
- Check the paperwork. Insurance certificate, license or registration where your state requires it, a written schedule, and a payment plan that doesn't front-load the whole job.
Here is the scope checklist we would want answered on any quote:
| Scope line | Ask |
|---|---|
| Unloading and carry-in | Who moves the cartons from the curb to the kitchen? |
| Assembly | Included, per box, or not applicable (pre-assembled)? |
| Level, shim and fasten bases and uppers | Fastened into studs with cabinet screws? Ledger for the uppers? |
| Fillers, scribe and end panels | Scribed to the wall, or butted and caulked? |
| Crown, light rail, toe kick | Included, per foot, or per piece? |
| Hardware | Drilling and mounting pulls and knobs included? |
| Appliance panels | Dishwasher or refrigerator panels fitted? |
| Countertop coordination | One trip or two? Is a return trip charged? |
| Removal and disposal | Included, priced separately, or excluded? |
| Punch list and callbacks | Door and drawer adjustment after a few weeks? |
This is where a cabinet supplier can help, even one that doesn't install. Our design service sends a 3D layout and an itemized cabinet quote within 24–48 hours, with every box, filler, panel and molding listed by SKU, and that list is what makes three installer quotes comparable. Our guide to reading cabinet SKU codes decodes the names on it. We can also recommend qualified professional installers in many areas, so contact us for installer referrals in your location.
Red flags: no written scope, full payment up front, no proof of insurance, and a bid far below the others with no explanation. That low bid has usually left out trim, removal or the second trip.
Where Installation Sits in the Remodel Schedule
Extra trips, idle days and rework visits all reach the bill, and most come from sequencing rather than slow work.
- Order against the lead time. Stock and made-to-order lines ship on very different clocks; our breakdown of fast lead-time cabinets by brand shows how far apart. Book the installer for after delivery.
- Receive and inspect. Standard freight is curbside. Our shipping FAQ asks you to inspect within 48 hours and to let cabinets acclimate in the room for 48 hours before installing. Damage found now is a freight claim; found after install, it is your problem.
- Rough-in, then cabinets. Plumbing and electrical changes happen with the walls open. Bases must be level and fastened before the countertop template.
- Template, fabrication, countertop install, then trim, hardware, appliance panels, hookups, backsplash and the punch list.
Get the countertop fabricator's dates before demolition starts, so the kitchen isn't without a sink longer than it has to be.
DIY Installation: What You Save and What You Risk
Doing it yourself saves the labor line and nothing else. On a 10x10 that is roughly $1,000–$4,000, less the tools you don't own: a 4-foot level and a laser or long straightedge, a stud finder, a drill and impact driver, clamps, shims, cabinet screws, and a saw that can rip a filler cleanly.
The risks mostly show up later:
- Bases out of level or out of plane. Quartz and granite need a flat, fully supported plane; a base run that twists can crack a slab or leave a gap the fabricator won't stand behind.
- Uppers fastened into drywall. Wall cabinets hang on screws driven through the hanging rail into studs. Drywall anchors alone are not a mounting method for a loaded cabinet.
- Racked boxes. A cabinet pulled out of square by an uneven wall makes doors that never line up, and frameless boxes show it more than framed ones.
- Returns and warranty. Our return policy excludes products that have been installed, and the warranty section of that policy excludes damage from improper installation. A mistake on install day is yours to fix.
DIY makes the most sense in a small, square kitchen with pre-assembled boxes and a laminate or butcher-block top. It makes the least sense with stone tops in an old house, with frameless or inset cabinets where uneven gaps show, or anywhere plumbing or wiring moves. A common middle path: hire the installer for boxes and crown, and do the demolition, painting, hardware and cleanup yourself. If you plan to finance the project, our explainer on kitchen cabinet financing covers the cabinet side; installation is paid to your installer directly.
Frequently Asked Questions
How much does it cost to install a single kitchen cabinet?
Taskrabbit's September 2026 guide puts a single cabinet at $125–$500 and 2–3 hours of work. The high end reflects minimum charges: an installer's first hour or two costs the same whether they hang one cabinet or four, so adding a cabinet to an existing kitchen costs far more per box than a full install.
What is the labor cost to install cabinets per linear foot?
Fixr's January 2026 guide gives $50–$200 per linear foot for labor alone. Wide, pre-assembled boxes in a square room sit at the bottom; narrow boxes, crooked walls, heavy trim and tall cabinets push toward the top.
How much are new kitchen cabinets for a 10x10, installed?
Add labor to the cabinet price. A 10x10 runs about 20 linear feet, so $1,000–$4,000 of installation labor on top of the cabinets. With our value-tier cabinets at $150–$250 a foot, that is roughly $4,000–$9,000 installed before countertops, freight and plumbing; the worked example above prices a specific Fabuwood Galaxy Frost package at about $5,250–$8,900 including removal and a small crown.
How much does it cost to install a kitchen island?
Price the island's cabinets like any other run, about $50–$200 per linear foot of island, then add time for anchoring it to the floor and fitting finished panels. An outlet, sink or cooktop brings in an electrician or plumber, and running power through an existing floor can cost more than the cabinet labor.
Do you install the cabinets you sell?
No. We are builders who sell cabinets, but installation is not part of a cabinet order: we ship nationwide and do not install the cabinets you buy from us. We can recommend qualified professional installers in many areas, so contact us for installer referrals in your location. The itemized list from our design service makes their quotes easy to compare.
Do I need a licensed contractor to install kitchen cabinets?
It depends on your state and on the scope. Swapping cabinets in the same layout often needs no permit, while some states require home-improvement contractors to register or hold a license. Moving plumbing, gas or electrical almost always needs licensed trades and a permit. Check with your local building department and ask any installer for proof of insurance.
How long does kitchen cabinet installation take?
Fixr gives 1–3 days for a mid-size kitchen, and up to a week for a complex layout with other upgrades. Taskrabbit gives 2–4 days for a standard kitchen and 3–7 days or more for a custom or large one. RTA assembly, removal, crooked walls and heavy trim push toward the top, and countertop templating usually means a return trip for the finish work.
Get an Itemized List Before You Call Installers
The fastest way to get installation quotes you can trust is to give every installer the same cabinet list. Send us your measurements through the design service and you will get a 3D layout and an itemized quote, with every box, filler, panel and molding named, that you can hand straight to installers in your area.
If you want to price the cabinets first, our cost estimator gives a range in about a minute. For anything else, reach us through the contact page or call 609-900-3358 and ask for an itemized quote you can take to your installer.

Written by
Noor K.Technology Manager at Captivating Cabinets
Noor manages and develops the Captivating Cabinets website, and writes practical guides on cabinet styles, finishes, pricing, and remodel planning.
Get a free 3D design + quote
- Your layout rendered in 3D, with an itemized quote
- Back in 24–48 hours
- Free, and yours to keep either way
Recent Articles

October 14, 2026
Bathroom Vanity Sizes and Heights: Widths, Depths and Clearances

October 14, 2026
How to Measure a Kitchen for Cabinets: A Field Guide With Checklist

October 13, 2026
Fast Lead Time Kitchen Cabinets: Lead Times by Brand

October 13, 2026
Shaker Kitchen Cabinets: Styles, Colors, Prices and How to Choose

October 13, 2026
Scribe Molding for Cabinets: What It Is and How to Fit It