Galaxy Nickel cabinet door
Toe Kick Cabinets icon
Fabuwood · Allure · Galaxy

Galaxy Nickel Toe Kick Cabinets

Shop Galaxy Nickel toe kick cabinets from the Fabuwood Allure Galaxy series at Captivating Cabinets.

Brand
Collection
Search
All filters

4 cabinets in Toe Kick Cabinets · Galaxy Nickel

Fabuwood Allure Galaxy Nickel Toe Kick Clip 3/4" | GN TKC-3/4
GN-TKC-3-4Fabuwood Allure Galaxy Nickel Toe Kick Clip 3/4" | GN TKC-3/4Toe Kick · Assembled
$10.40
-35%
$16.00
1
Fabuwood Allure Galaxy Nickel Toe Kick 3/4" (8 ft) | GN TK8-3/4
GN-TK8-3-4Fabuwood Allure Galaxy Nickel Toe Kick 3/4" (8 ft) | GN TK8-3/4Toe Kick · Assembled
$58.50
-35%
$90.00
1
Fabuwood Allure Galaxy Nickel Toe Kick Cap | GN TKC
GN-TKCFabuwood Allure Galaxy Nickel Toe Kick Cap | GN TKCToe Kick · Assembled
$7.80
-35%
$12.00
1
Fabuwood Allure Galaxy Nickel Toe Kick (8 ft) | GN TK8
GN-TK8Fabuwood Allure Galaxy Nickel Toe Kick (8 ft) | GN TK8Toe Kick · Assembled
$55.90
-35%
$86.00
1

Shop by Width

Fabuwood Galaxy Key Features

Door Style
Solid wood door frames with ⅜” MDF center panel
Box Construction
½” select solid wood construction
Drawer Glide
Tandem plus Blumotion full extension concealed drawer runners
Drawer Head
5-piece recessed panel drawer fronts
Drawer Construction
⅝” solid wood drawer box with dovetail construction
Hinge
Hinges feature Quick-Release Technology with Blumotion Soft-close
Cabinet Interior
Natural wood veneer finished interior
Cabinet Exterior
Pre-assembled
Assembly Method
Dowels and glue / Pocket screw Joinery
Delivery
7 Days – 3 Weeks · Pre-assembled

The most-kicked strip in the kitchen: toe kick length, mitres and the finished floor height

Reviewed September 2026 · Captivating Cabinets

Nobody has ever chosen a kitchen because of the toe kick, and nobody has ever failed to notice a bad one. It is the four-and-a-bit inches of finished material closing the recess under the base cabinets, it costs $55.90 for eight feet, and it is simultaneously the cheapest part on the order, the one most likely to be short on install day, and the only surface in the room that is hit by a shoe several times a day for twenty years. This page is about getting the quantity right, getting the corners right, and getting it in after the floor rather than before.

How many feet a real kitchen actually takes

A tape measure held against a kitchen cabinet to check height
The recess height is fixed by the cabinet. What is not fixed is how much of it the kick covers once a finished floor has gone in underneath.

Most short orders come from measuring the visible front of the base run and stopping there. Do the takeoff properly and the number is noticeably bigger, because a kick follows the cabinet, and cabinets go round things.

Work it as running feet, in this order: the front face of every base run, plus both returns wherever a run ends away from a wall, plus all four sides of an island, plus the exposed side of any tall cabinet that has a kick, plus the recess in front of any appliance opening whose kick continues behind it. Then add the short pieces at the toe of a corner cabinet, which are easy to overlook and impossible to substitute.

Typical takeoffs, in running feet and eight-foot sticks
KitchenRunning feetSticks at 8 ftCost at $55.90
Galley, one base wall, 10 ft~11 ft2$111.80
L-shaped 10x10, no island~19 ft3$167.70
L-shaped 10x10 plus a 6 ft island~34 ft5$279.50
U-shaped with a peninsula~28 ft4$223.60
Large kitchen, island plus a tall run~45 ft6$335.40

Two things fall out of that table. The first is that an island roughly doubles the toe kick on a mid-size kitchen — four sides of a six-foot island is fifteen running feet before anything else, which is more than the whole of a small galley. The second is that even the largest row here is under $340.00, which puts the entire part in the noise against a cabinet order and makes any argument about ordering an extra stick faintly absurd. Layouts and their run lengths are in the kitchen layouts guide, and the base run itself is priced on the base cabinet page.

Two thicknesses, a cap and a clip

Four parts are stocked and they answer two different questions: how thick, and how is it held on.

The toe kick parts, displayed prices at review
PartCodePriceWhat it is for
Toe kick, 8 ftGN TK8$55.90The standard length — the default on most orders
Toe kick 3/4″, 8 ftGN TK8-3/4$58.50The thicker section, where the kick returns against a heavier panel
Toe kick capGN TKC$7.80Closing the end of a run where the kick stops in the open
Toe kick clip 3/4″GN TKC-3/4$10.40Fixing the thicker kick without face-nailing it

The thickness choice is usually made for you by what the kick has to meet. A standard kick sits back in the recess and touches nothing; a three-quarter-inch one is what you want where it returns against a finished end panel or an island panel of similar thickness, so the two read as one plane rather than as a step. If the drawing shows finished panels down to the floor, ask for the thicker version at those locations.

The clip is the detail worth insisting on. A kick fixed with clips can be removed — for a dishwasher change, a leak, a floor repair, a cable run — and put back without a mark. A kick that has been face-nailed or glued comes off in pieces, and the replacement is another stick and another trip. At $10.40 the clip is the difference between a serviceable kitchen and one where the first plumbing call damages the finish.

The floor decision that has to happen before the cabinets go in

This is the single most consequential thing on the page and it has nothing to do with the trim. Base cabinets are set to a level line, and the toe kick is cut to whatever distance is left between the bottom of the cabinet and the floor at each point. So the question is: which floor?

If the cabinets are set on the subfloor and three-quarters of an inch of hardwood goes down afterwards, three-quarters of an inch of the recess disappears, and the kick that was cut before the floor went in is now too tall to fit. If it was cut afterwards, it fits and the recess is shallower than the drawing showed — which affects nothing except the look, and only slightly.

If the floor goes in first and runs under the cabinets, the cabinets sit higher and the counter height moves up by the floor thickness, which matters if an appliance has to slide in under the counter with a tight tolerance. Neither approach is wrong; what is wrong is not deciding until the cabinets are on site.

The operational rule that follows is simple and it is the one we give every installer: order the toe kick with the cabinets and cut it last, after the finished floor. It is the only part of a cabinet order that should be sitting in its packaging while the rest of the kitchen is being used. The floor-thickness and appliance-clearance numbers to check are in the kitchen dimensions guide, and the quarter round page covers the gap that opens when the floor is a floating one.

Inside corners, outside corners, and the end of a run

Three joints, three treatments, and getting them wrong is what separates a fitted kick from a nailed-on one.

  1. An inside corner, where two base runs meet. A mitre is the right answer and a butt joint is the acceptable one, because the joint sits deep in the recess where light never reaches it. If the installer butts it, make sure the piece running through is the one facing the room.
  2. An outside corner, at an island end or where a run turns into the room. This one must be mitred. A butt joint here shows the cut end of the material, and a cut end is not a finished surface — it is core, in a colour nothing like the face. This is the joint that gives away a rushed install.
  3. The end of a run in the open, where the kick simply stops. This is what GN TKC at $7.80 is for: a cap that closes the end so the section is not left exposed. It is under eight dollars and it is forgotten on most orders.
  4. A return at a tall cabinet, where the kick has to die into a cabinet side that comes down to the floor. Usually a scribed butt rather than a mitre, and the piece wants to be cut a shade long and eased in.

The general principle behind all four: a mitre wherever the joint is visible from the room, a butt wherever it is buried in the recess. Nobody is examining the inside corner of a toe kick. Everybody walks past the island corner.

The most-kicked, most-mopped surface in the room

Count what happens to this strip. It takes the toe of a shoe every time somebody stands at the counter, which on a sink run is thousands of contacts a year. It takes a mop head and whatever water the mop is carrying, several times a week, along its entire length. It takes the vacuum, the dog, the toddler, the chair legs and the occasional dropped pan. There is no other finished surface in a kitchen with a workload remotely like it, and it is the one nobody thinks about when specifying.

This is the one place on this whole nine-page trim list where the mid-tone genuinely earns its keep: scuffs, splashes and shoe marks at floor level simply do not read on a grey the way they do on a white kick, which spends its life looking like it needs wiping.

Two practical consequences. Keep standing water away from it — the bottom edge is the part of a cabinet order most exposed to a mop bucket, and the cleaning and care guide has the routine. And treat it as a consumable on a rental or a flip: a kick that has taken ten years of tenants can be replaced for $55.90 a stick without touching a cabinet, which is the cheapest possible way to make a kitchen look refreshed. That argument is made at length in the property manager guide and the house flipper guide.

Common questions

How much toe kick do I need for a kitchen?
Count the front of every base run, both returns where a run ends away from a wall, all four sides of any island, the exposed side of a tall cabinet, and the recess across appliance openings. An L-shaped 10x10 with a six-foot island comes to roughly 34 running feet — five eight-foot sticks at $55.90 each.
What is the difference between the standard and 3/4″ toe kick?
Section thickness. GN TK8 at $55.90 is the default and sits back in the recess touching nothing. GN TK8-3/4 at $58.50 is used where the kick returns against a finished end or island panel of similar thickness, so the two read as one plane rather than a step.
Do I need toe kick clips?
They are worth the $10.40. GN TKC-3/4 lets the kick be removed and refitted without a mark — for a dishwasher swap, a leak, a floor repair or a cable run. A face-nailed or glued kick comes off in pieces and needs replacing.
Should toe kick go in before or after the flooring?
After, always. Order it with the cabinets and cut it last. If the cabinets are set on the subfloor and three-quarters of an inch of hardwood goes in afterwards, a kick cut beforehand is too tall to fit. Decide the floor build-up before the cabinets are set, then cut the kick to what is actually left.
Does toe kick need to be mitred at corners?
At outside corners, yes — a butt joint there shows the cut end, which is core rather than finish and is visible from the room. At inside corners a butt joint is acceptable because it sits deep in the recess. Where a kick stops in the open, use GN TKC cap at $7.80 to close the end.
How well does toe kick hold up to wear?
It takes more punishment than any other finished surface in the room — shoes, mops, vacuums and chair legs, daily, for decades. A mid-tone hides scuffs and splashes at floor level far better than a white one does, and if it ever does look tired it can be replaced at $55.90 a stick without touching the cabinets.

Keep reading

The guides behind the numbers on this page.

Get a free 3D design + quote

  • Your layout rendered in 3D, with an itemized quote
  • Back in 3–5 business days
  • Free, and yours to keep either way
Start my design

Still choosing the color? Order a Galaxy Nickel sample and see it in your own light first.

On this page
  1. How many feet a real kitchen actually takes
  2. Two thicknesses, a cap and a clip
  3. The floor decision that has to happen before the cabinets go in
  4. Inside corners, outside corners, and the end of a run
  5. The most-kicked, most-mopped surface in the room
  6. Common questions
  7. Keep reading

Your Cart

Your cart is empty.

Browse cabinets →
Free · No obligation

See your new kitchen before you spend a dollar

Send rough measurements and a few photos. A designer replies within 1 business day, and you get photorealistic 3D renderings with an itemized quote in 3–5 business days.

Contractors save 20–40% off retail. Have a quick question? Ask Cabinets AI →

Kitchen designed with the free 3D design service from Captivating Cabinets